MALAYSIA REAL ESTATE






Advertise Here 


List Your Companies Here  >>>    Post Your Property For Sale Totally Free (New) >>>

Realtors and Real Estate Agents - Sign Up for Free Account at Property.net.my >>


Download our Free Tool Bar for IE Internet Explorer



Malaysia Real Estate
Malaysia Real Estate Portal
 
 FAQFAQ   SearchSearch   UsergroupsUsergroups   RegisterRegister 
 ProfileProfile   Log in to check your private messagesLog in to check your private messages   Log inLog in 

JUTA MINES CONDO..
Goto page Previous  1, 2, 3 ... 49, 50, 51 ... 86, 87, 88  Next
 
Post new topic   Reply to topic    Malaysia Real Estate Forum Index -> Property Investment
View previous topic :: View next topic  
Author Message
g5sim



Joined: 22 Jul 2005
Posts: 1047

PostPosted: Fri Aug 24, 2007 4:45 am    Post subject: Reply with quote

erisha wrote:
waaa.. so exited eh? so, ada sesiapa yg akan pindah masuk dlm masa terdekat ni? [smiling to g5sim]. hehehe..


not yet lah. atleast two more months to move in lah. defect. furnishing then move in :p
Back to top
View user's profile
thliow



Joined: 26 Jul 2005
Posts: 181
Location: KL

PostPosted: Fri Aug 24, 2007 8:39 am    Post subject: Reply with quote

not yet lah. atleast two more months to move in lah. defect. furnishing then move in :p[/quote]

anybody know how long have to wait for the CF approve? Smile
Back to top
View user's profile MSN Messenger
javabean



Joined: 30 Sep 2005
Posts: 95

PostPosted: Fri Aug 24, 2007 8:49 am    Post subject: Reply with quote

g5sim wrote:

my quote for the compulsory grille = RM860 also from the panel renovator :p

no kids no need to grille the rest lah. lazy lah

my car park is also on level 5 Lift till level 3 only :p


eh sim, compulsory grill tu apa yg ada?
list kan bleh??
Back to top
View user's profile Yahoo Messenger
g5sim



Joined: 22 Jul 2005
Posts: 1047

PostPosted: Fri Aug 24, 2007 12:52 pm    Post subject: Reply with quote

javabean wrote:
g5sim wrote:

my quote for the compulsory grille = RM860 also from the panel renovator :p

no kids no need to grille the rest lah. lazy lah

my car park is also on level 5 Lift till level 3 only :p


eh sim, compulsory grill tu apa yg ada?
list kan bleh??


aiyo - u never read my posts izit ! Laughing Laughing

compulsory - for second floor and above - main door, yard opening, yard airflow and kitchen window Smile
Back to top
View user's profile
meli74



Joined: 07 Aug 2007
Posts: 142
Location: Balakong

PostPosted: Fri Aug 24, 2007 1:14 pm    Post subject: Reply with quote

anyone got quote of concrete basin for kitchen plus cabinet?


g5sim wrote:
javabean wrote:
g5sim wrote:

my quote for the compulsory grille = RM860 also from the panel renovator :p

no kids no need to grille the rest lah. lazy lah

my car park is also on level 5 Lift till level 3 only :p


eh sim, compulsory grill tu apa yg ada?
list kan bleh??


aiyo - u never read my posts izit ! Laughing Laughing

compulsory - for second floor and above - main door, yard opening, yard airflow and kitchen window Smile
Back to top
View user's profile MSN Messenger
g5sim



Joined: 22 Jul 2005
Posts: 1047

PostPosted: Fri Aug 24, 2007 2:03 pm    Post subject: Reply with quote

meli74 wrote:
anyone got quote of concrete basin for kitchen plus cabinet?


erm i will get the friend to quote. but i dont intend to get one myself. I use the kitchen to boil water, fried egg and the most difficult cooking that would do is maggi mee Shocked , the kitchen cabinet is there so that i can take photo and show my parents that i have a kitchen to cook a healthy meal. If they want to visit, then i can cook lah. anyhow .. Domino pizza is sooo near. There are two actually, one in Mines and one just beside the silk highway before Jutamines Very Happy
Back to top
View user's profile
erisha



Joined: 21 Mar 2007
Posts: 250
Location: bangsar

PostPosted: Fri Aug 24, 2007 2:34 pm    Post subject: Reply with quote

g5sim wrote:
erisha wrote:
waaa.. so exited eh? so, ada sesiapa yg akan pindah masuk dlm masa terdekat ni? [smiling to g5sim]. hehehe..


not yet lah. atleast two more months to move in lah. defect. furnishing then move in :p


so long ka? i need to move in b4 end of year lah. hopefully ok lah!
cf wont take so long kan.
Back to top
View user's profile Yahoo Messenger
thliow



Joined: 26 Jul 2005
Posts: 181
Location: KL

PostPosted: Fri Aug 24, 2007 2:43 pm    Post subject: Reply with quote

so long ka? i need to move in b4 end of year lah. hopefully ok lah!
cf wont take so long kan.[/quote]

Kalau dapat CF, saya akan cuba siapkan renovation & pindah masuk secepat mungkin....Smile
Back to top
View user's profile MSN Messenger
g5sim



Joined: 22 Jul 2005
Posts: 1047

PostPosted: Fri Aug 24, 2007 3:11 pm    Post subject: Reply with quote

erisha wrote:
so long ka? i need to move in b4 end of year lah. hopefully ok lah! cf wont take so long kan.


its not only CF u know. first fixing the defects. Then grille atleast 10days after confirmation. Without the grille you dare to renovate the unit ah? :p

Me alone to settle the whole house - no family members around - just with the help of some friends. I think if i fedap, grille, lights, fans move my 3V college (the steel one) lol i bought when i did my degree at UPM and thats it. I am in. Annoying lah the whole moving house thingy. Why didnt they offer the furnishing package when we bought our unit. so i dun have to bother doing anything Laughing Laughing
Back to top
View user's profile
Rzidar21



Joined: 16 Aug 2006
Posts: 112

PostPosted: Fri Aug 24, 2007 3:26 pm    Post subject: Reply with quote

erisha wrote:
g5sim wrote:
erisha wrote:
waaa.. so exited eh? so, ada sesiapa yg akan pindah masuk dlm masa terdekat ni? [smiling to g5sim]. hehehe..


not yet lah. atleast two more months to move in lah. defect. furnishing then move in :p


so long ka? i need to move in b4 end of year lah. hopefully ok lah!
cf wont take so long kan.


if minor defect 1 week also can finish but kitchen & grill renovation may be takes time la coz now got block A & B, last time only block A so less than 1 mth can finish. my kitchen 3 weeks complete already. this panel quite o.k la. if something rosak can repair & replace quickly.
Back to top
View user's profile
meli74



Joined: 07 Aug 2007
Posts: 142
Location: Balakong

PostPosted: Fri Aug 24, 2007 3:33 pm    Post subject: Reply with quote

, the kitchen cabinet is there so that i can take photo and show my parents that i have a kitchen to cook a healthy meal. ,

?? kitchen cabinet is there? means sudah pasang? no matter what u cook, have to wash rite, so a single singki there is nt enuf to put a rack, sabun and so on..

Tau lar ada domino, nt just domino, mines shopping fair n jusco is nearby, can eat whatever there but home cooking is the best and healthy lar.. Laughing
Back to top
View user's profile MSN Messenger
kips2020



Joined: 25 Jul 2005
Posts: 40

PostPosted: Sat Aug 25, 2007 8:54 am    Post subject: Reply with quote

javabean wrote:
g5sim wrote:

my quote for the compulsory grille = RM860 also from the panel renovator :p

no kids no need to grille the rest lah. lazy lah

my car park is also on level 5 Lift till level 3 only :p


eh sim, compulsory grill tu apa yg ada?
list kan bleh??


Eh, if 860 for compulsory grille, I'd go for that, no need to lock up the whole house. I might drop by tis afternoon for reno free quotation.
Back to top
View user's profile
diniza



Joined: 18 Sep 2005
Posts: 84

PostPosted: Sat Aug 25, 2007 6:51 pm    Post subject: Reply with quote

anybody who had visited their unit and filled in the defect list maybe can share here - so that others can take it as guides to look where/what are the common defect.

Anybody noticed the workmanship on the wall, ceilling, floor tiles, skirting - not even, rough, wavvy...
Back to top
View user's profile Yahoo Messenger
g5sim



Joined: 22 Jul 2005
Posts: 1047

PostPosted: Sat Aug 25, 2007 7:57 pm    Post subject: Reply with quote

1. Wall tile cracks - kitchen
2. window frame dented - RM3
3. stains caused by rain water - RM3
4. windows cannot be closed properly
5. rough ceiling boarding and wall gaps - bath 2 and 1
6. Head stone not done - Bath 2
7 Floor trap clogged up - Bath 1
8. Sliding door frame gaps - Bath 1
9. Rough window corners - RM2
10. Floor tiles with clipped surface - Dinning
11. Wall unpainted - missing floor tile - balcony
12. Sling door - extremely hard to lock - Living
13. Smart home wire outside kitchen - kitchen
14. Wall surface need touch up - Dinning and living
15. Surface - electrical poitns need to touch up/ repair - all
16. BD board not completed
17. Sliding window extremely hard to close - Kitchen
18. Opening area to touch up - yard
19. Skirting area to repaing - living
20. Gap on sliding door panel - not aligned - Balcony
21. Kitchen skirting - missing tile
Back to top
View user's profile
erisha



Joined: 21 Mar 2007
Posts: 250
Location: bangsar

PostPosted: Mon Aug 27, 2007 11:27 am    Post subject: Reply with quote

g5sim wrote:
1. Wall tile cracks - kitchen
2. window frame dented - RM3
3. stains caused by rain water - RM3
4. windows cannot be closed properly
5. rough ceiling boarding and wall gaps - bath 2 and 1
6. Head stone not done - Bath 2
7 Floor trap clogged up - Bath 1
8. Sliding door frame gaps - Bath 1
9. Rough window corners - RM2
10. Floor tiles with clipped surface - Dinning
11. Wall unpainted - missing floor tile - balcony
12. Sling door - extremely hard to lock - Living
13. Smart home wire outside kitchen - kitchen
14. Wall surface need touch up - Dinning and living
15. Surface - electrical poitns need to touch up/ repair - all
16. BD board not completed
17. Sliding window extremely hard to close - Kitchen
18. Opening area to touch up - yard
19. Skirting area to repaing - living
20. Gap on sliding door panel - not aligned - Balcony
21. Kitchen skirting - missing tile


is this the list of ur defect? aiyo. so many ka? and i noticed some of
them will charge u rm 2 or 3 eh? like dat... i pny loan pun tak byr
lagi, knci pun blm dpt g. nk tgk defect blm lg la.
Back to top
View user's profile Yahoo Messenger
g5sim



Joined: 22 Jul 2005
Posts: 1047

PostPosted: Mon Aug 27, 2007 12:02 pm    Post subject: Reply with quote

erisha wrote:
is this the list of ur defect? aiyo. so many ka? and i noticed some of them will charge u rm 2 or 3 eh? like dat... i pny loan pun tak byr lagi, knci pun blm dpt g. nk tgk defect blm lg la.


tarak banyak. DUA PULUH SATU SAHAJA !! Laughing

yalah my defect list. they dont charge you lah.

apasal yu nya loan banyak lambat?


one more thing people, i went to the panel renovator and negotiate with the lady with we can get cheaper on bulk. She will see what she can do and email me the the bulk price . see how lah. if still expensive then, i go pay for my deposit lah. I am getting them to do the grille at RM850 (previously she said RM860 now RM 850 pula) for compulsory grille. see if got discount or not lah
Back to top
View user's profile
erisha



Joined: 21 Mar 2007
Posts: 250
Location: bangsar

PostPosted: Mon Aug 27, 2007 12:42 pm    Post subject: Reply with quote

g5sim wrote:
erisha wrote:
is this the list of ur defect? aiyo. so many ka? and i noticed some of them will charge u rm 2 or 3 eh? like dat... i pny loan pun tak byr lagi, knci pun blm dpt g. nk tgk defect blm lg la.


tarak banyak. DUA PULUH SATU SAHAJA !! Laughing

yalah my defect list. they dont charge you lah.

apasal yu nya loan banyak lambat?


one more thing people, i went to the panel renovator and negotiate with the lady with we can get cheaper on bulk. She will see what she can do and email me the the bulk price . see how lah. if still expensive then, i go pay for my deposit lah. I am getting them to do the grille at RM850 (previously she said RM860 now RM 850 pula) for compulsory grille. see if got discount or not lah


biasalah. government loan. i called perumahan last week, they
said by this week baru print cheque, then baru hntr to jutamines.
xtau brp lma settle.

i takut klu amek dgn panel, lmbt siap la. sbb waiting list mesti dh
pjg kan? but if cheaper, and i pun mgkn pndh msk disember, can
wait la kan. why not use the panel contractor ye tak? mmg dh lmbt
pun. hehehe..

kita akan dpt bil letrik n air tak agaknya this month? i nk gna utk
daftar sekolah anak la. Laughing
Back to top
View user's profile Yahoo Messenger
meli74



Joined: 07 Aug 2007
Posts: 142
Location: Balakong

PostPosted: Mon Aug 27, 2007 2:51 pm    Post subject: Reply with quote

Wah..semua dah teriya-iya check defect kot..my loan dah approved, but afraid got problem again, coz i was taking 'completed project' punya loan, bank mesti nak copy of CF then onli can released whole payment to Jutamines, but CF...??? blum lagi kan? Do u think Jutamines will give me the key to do defect 1st...?? Malas betul nk call dia org..

RM850.00 is ok i think for the grille, i dun think they will keep u long coz no matter how its still panel contractor rite, jadi, mesti buat cantek punya! Anyhow, sendiri mesti adjust time to move-in loh, kurangx2 another two mths..
Back to top
View user's profile MSN Messenger
erisha



Joined: 21 Mar 2007
Posts: 250
Location: bangsar

PostPosted: Mon Aug 27, 2007 3:05 pm    Post subject: Reply with quote

meli74 wrote:
Do u think Jutamines will give me the key to do defect 1st...?? Malas betul nk call dia org..


nope. i dh try. william ckp dont worry, akan ada masa setahun untuk cek
defect. jutamines akan ikut perjanjian which said apa2 kerosakan yg
berlaku dlm rumah dlm masa setahun akan ditanggung oleh developer.

nk tak nk kna tggu jugaklah. i'm also waiting rite now. nk cari quotation
pun tak brani.
Back to top
View user's profile Yahoo Messenger
meli74



Joined: 07 Aug 2007
Posts: 142
Location: Balakong

PostPosted: Mon Aug 27, 2007 4:01 pm    Post subject: Reply with quote

Dah called william, he sed jutamines will send a letter to bank saying that diaorang will claim certain amt from bank (in percentage) so that owner can get the key, buat defect n renovate the unit tapi tidak boleh duduk not until get the CF.

Some bank released the payment n some nak tengok CF jugak, if nt, sorry..i punya blum tau lagi..kena call bank jugak..


erisha wrote:
meli74 wrote:
Do u think Jutamines will give me the key to do defect 1st...?? Malas betul nk call dia org..


nope. i dh try. william ckp dont worry, akan ada masa setahun untuk cek
defect. jutamines akan ikut perjanjian which said apa2 kerosakan yg
berlaku dlm rumah dlm masa setahun akan ditanggung oleh developer.

nk tak nk kna tggu jugaklah. i'm also waiting rite now. nk cari quotation
pun tak brani.
Back to top
View user's profile MSN Messenger
meli74



Joined: 07 Aug 2007
Posts: 142
Location: Balakong

PostPosted: Mon Aug 27, 2007 4:05 pm    Post subject: Reply with quote

CF mid of September'07 woh..according to William
Back to top
View user's profile MSN Messenger
erisha



Joined: 21 Mar 2007
Posts: 250
Location: bangsar

PostPosted: Mon Aug 27, 2007 6:05 pm    Post subject: Reply with quote

meli74 wrote:
CF mid of September'07 woh..according to William


without CF cannot move in or even renovate or pasang cabinet kan?
esok call william to ask abt my hse loan la.
Back to top
View user's profile Yahoo Messenger
g5sim



Joined: 22 Jul 2005
Posts: 1047

PostPosted: Tue Aug 28, 2007 3:23 am    Post subject: Reply with quote

erisha wrote:
meli74 wrote:
CF mid of September'07 woh..according to William


without CF cannot move in or even renovate or pasang cabinet kan?
esok call william to ask abt my hse loan la.


can but if anything resulting the problem issuing the of the CF to that particular unit. tanggung sendiri :p

i am pasanging the grille soon :p

cabinet also but after the defects have been rectified lah
Back to top
View user's profile
g5sim



Joined: 22 Jul 2005
Posts: 1047

PostPosted: Tue Aug 28, 2007 4:13 am    Post subject: Reply with quote











Back to top
View user's profile
g5sim



Joined: 22 Jul 2005
Posts: 1047

PostPosted: Tue Aug 28, 2007 4:47 am    Post subject: Reply with quote















Back to top
View user's profile
Display posts from previous:   
Post new topic   Reply to topic    Malaysia Real Estate Forum Index -> Property Investment All times are GMT + 8 Hours
Goto page Previous  1, 2, 3 ... 49, 50, 51 ... 86, 87, 88  Next
Page 50 of 88

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum



This is a free forum intended to foster communication between all users.
Hileytech Sdn Bhd does not guarantee the correctness or validity of postings, nor does Hileytech endorse any postings. No posting or contents in this forum can be copied and reproduced without prior permission from Hileytech and the owner of the posting. All other names and marks are trade names, trademarks or registered trademarks of their respective owners.
Powered by phpBB, Another web site by www.hileytech.com,Forum Archive
Tel : +60-3-42978281 ::  Fax : +60-3-42978254 :: hiley@hileytech.com