| View previous topic :: View next topic |
| Author |
Message |
meli74
Joined: 07 Aug 2007 Posts: 142 Location: Balakong
|
Posted: Tue Aug 14, 2007 9:22 am Post subject: |
|
|
yelah, memang lah ogos yang kita maksudkan..hopefully everything in smooth..and u org lama mesti dah kebal ngan diaorg punya answer rite? Relax & cool down cikit dulu ahh..
| erisha wrote: | | meli74 wrote: | | kita orang baru pun teringin-ingin jugak nak move-in cepat..but procedure kena follow, i called developer and they tepuk tepuk dada sed within dis mth dapat CF, but dis mth means ???? now oredi middle of mth ooh.. |
yalor. imagine we get the same answer since cny 2007, until
now still the same answer. lets hope jutamines will get the
cf this month for real.
when i said 'this month' means, august tau.  |
|
|
| Back to top |
|
 |
thliow
Joined: 26 Jul 2005 Posts: 181 Location: KL
|
Posted: Tue Aug 14, 2007 9:37 am Post subject: |
|
|
yalor. imagine we get the same answer since cny 2007, until
now still the same answer. lets hope jutamines will get the
cf this month for real.
when i said 'this month' means, august tau. [/quote]
saya lagi nak cepat cepat move in... my wedding date on middle of November 2007 sekarang still sewa rumah.... takkan after wedding still belum dapat rumah lagi??? betul tak? ?  |
|
| Back to top |
|
 |
meli74
Joined: 07 Aug 2007 Posts: 142 Location: Balakong
|
Posted: Tue Aug 14, 2007 9:46 am Post subject: |
|
|
Congrates thliow,
Nov'07 is quite near..mesti bz ooh, married and moving..
as for us, we plan either b4 christmas or cny, of coz earlier is better. Dun hope too much first at dis moment.. |
|
| Back to top |
|
 |
thliow
Joined: 26 Jul 2005 Posts: 181 Location: KL
|
Posted: Tue Aug 14, 2007 9:56 am Post subject: |
|
|
| meli74 wrote: | Congrates thliow,
Nov'07 is quite near..mesti bz ooh, married and moving..
as for us, we plan either b4 christmas or cny, of coz earlier is better. Dun hope too much first at dis moment.. |
TQ but no choice lo, i tot end of JUNE 2007 can get house key. If really end of this month can get house key, must try ASAP to do renovation and move in before Oct 2007 Hopefully really can get key by end of this month... |
|
| Back to top |
|
 |
meli74
Joined: 07 Aug 2007 Posts: 142 Location: Balakong
|
Posted: Tue Aug 14, 2007 10:19 am Post subject: |
|
|
FYI, Cf out means have to wait another two weeks only can get keys..somemore if u do renovation, must extimate 1 mth to complete..depends on how u renovate. Lagi kena put a 3k deposit at developer there if u r nt choosing their in-house punya renovator. If u do ur own means developer will check after the work finiz n confirm that no sampah sampah kena buang then onli they give back the 3k to u. If got means, kena tolak lagi..
| thliow wrote: | | meli74 wrote: | Congrates thliow,
Nov'07 is quite near..mesti bz ooh, married and moving..
as for us, we plan either b4 christmas or cny, of coz earlier is better. Dun hope too much first at dis moment.. |
TQ but no choice lo, i tot end of JUNE 2007 can get house key. If really end of this month can get house key, must try ASAP to do renovation and move in before Oct 2007 Hopefully really can get key by end of this month... |
|
|
| Back to top |
|
 |
meli74
Joined: 07 Aug 2007 Posts: 142 Location: Balakong
|
Posted: Tue Aug 14, 2007 10:26 am Post subject: |
|
|
| thliow, dun 4get bout the defect..got the keys oredi liaw means kena check the defect, if the house is in proper than nvmind lar..if got defect kena lagi tunggu diaorg do the rectify, one mth? or more than that as the developer remind me that "bukan buat u satu orang je".. Pls. be prepared loh.. |
|
| Back to top |
|
 |
g5sim
Joined: 22 Jul 2005 Posts: 1047
|
Posted: Tue Aug 14, 2007 10:46 am Post subject: |
|
|
| bunyi anjing menyalak lagi sedap dengar !! |
|
| Back to top |
|
 |
thliow
Joined: 26 Jul 2005 Posts: 181 Location: KL
|
Posted: Tue Aug 14, 2007 10:57 am Post subject: |
|
|
| meli74 wrote: | | thliow, dun 4get bout the defect..got the keys oredi liaw means kena check the defect, if the house is in proper than nvmind lar..if got defect kena lagi tunggu diaorg do the rectify, one mth? or more than that as the developer remind me that "bukan buat u satu orang je".. Pls. be prepared loh.. |
Good advise Will be in proper planning Thanks a lot.... |
|
| Back to top |
|
 |
erisha
Joined: 21 Mar 2007 Posts: 250 Location: bangsar
|
Posted: Tue Aug 14, 2007 12:56 pm Post subject: |
|
|
| g5sim wrote: | | bunyi anjing menyalak lagi sedap dengar !! |
hahaha.. yalor. sound so many things to be 'geram' later.
bilalah nk setel smua ni?
bosanlah! |
|
| Back to top |
|
 |
Kerlsea
Joined: 25 May 2007 Posts: 17 Location: Seri Kembangan
|
Posted: Tue Aug 14, 2007 1:04 pm Post subject: |
|
|
| thliow, congrates ! Earlier on when they said CF by Aug, I also plan to move in by Nov 2007.... Anyway, if you got good contractor for your decor, please share with us in the forum. Thanks.... |
|
| Back to top |
|
 |
javabean
Joined: 30 Sep 2005 Posts: 95
|
Posted: Tue Aug 14, 2007 1:05 pm Post subject: |
|
|
hukhukhuk..mmg geram la
so mulai sekarang memang taknak berharap lah
berhenti berharap.
next month puasa already..absolutely cannot move. mana larat
so cannot raya kat rumah baru lohhhh...
 |
|
| Back to top |
|
 |
Kerlsea
Joined: 25 May 2007 Posts: 17 Location: Seri Kembangan
|
Posted: Tue Aug 14, 2007 1:09 pm Post subject: |
|
|
| erisha wrote: | | g5sim wrote: | | bunyi anjing menyalak lagi sedap dengar !! |
hahaha.. yalor. sound so many things to be 'geram' later.
bilalah nk setel smua ni?
bosanlah! |
The time when I saw and bought the unit, Juta Mines was nearly 95% complete. I was sooooooo happy as I thought I just have to wait for 1 or 2 months to move in. Quite dissapointed. Now I am as peaceful as the lake behind Juta Mines... wait and see loh, what to do. |
|
| Back to top |
|
 |
erisha
Joined: 21 Mar 2007 Posts: 250 Location: bangsar
|
Posted: Tue Aug 14, 2007 1:22 pm Post subject: |
|
|
| Kerlsea wrote: | | The time when I saw and bought the unit, Juta Mines was nearly 95% complete. I was sooooooo happy as I thought I just have to wait for 1 or 2 months to move in. Quite dissapointed. Now I am as peaceful as the lake behind Juta Mines... wait and see loh, what to do. |
i dh cuba utk bertenang since cny 2007. sbb masa i amek cek rebate
on bulan puasa 2006, they said can get key on dec 2006. then cny 2007,
then april, may, june, july and till now. sbb tu i dh tak boleh tahan lg
dgn janji2 palsu. hehehe..
masa beli dulu, on 2005, salesman tu ckp by end of 2006 paling lmbt siap.
mana nk tau sbnrnya plg lmbt is dec 2007. setahun tertunda. lama tu.
masa i beli, anak i 2, skrg dh 3 and yg baby tu pun dah berjalan n berckp.
bygkan berapa lama. hahahahaha...
i tggu antara tenang dan tidak skrg ni. kalau2 rasa nk tau, i call jutamines
walaupun i tau berita yg akan disampaikan tak berapa best utk didgr. tp
sbg pembeli i masih nk tau status terkini. best atau tidak, i nak tau juga.
kalau ikut s&p lbh 3 thn, kita boleh saman developer. i xnk sampai jadi
mcm tu lah, kan.
ish. kdg2 cerita pasal rumah ni, boleh buat kita emosional tau.  |
|
| Back to top |
|
 |
meli74
Joined: 07 Aug 2007 Posts: 142 Location: Balakong
|
Posted: Tue Aug 14, 2007 1:22 pm Post subject: |
|
|
| Hi..Good news..juz went to Juta Mines ofis juz nw, slsman told me CF is absolutely out either by end of Aug or early of Sept. But dis time they giving out the keys 1st to owner to check on their respective unit. Meaning that juta mines will call up owner come and collect key on dis week, Sat n Sun. So, pls contact Juta Mines right now to make the necessary arrangement. |
|
| Back to top |
|
 |
erisha
Joined: 21 Mar 2007 Posts: 250 Location: bangsar
|
Posted: Tue Aug 14, 2007 1:28 pm Post subject: |
|
|
| meli74 wrote: | | Hi..Good news..juz went to Juta Mines ofis juz nw, slsman told me CF is absolutely out either by end of Aug or early of Sept. But dis time they giving out the keys 1st to owner to check on their respective unit. Meaning that juta mines will call up owner come and collect key on dis week, Sat n Sun. So, pls contact Juta Mines right now to make the necessary arrangement. |
aiyak! i'm so exited sampai lupa i call in the midle of lunch hour. hehehe..
will call back at 2 pm.
thanks meli74. |
|
| Back to top |
|
 |
g5sim
Joined: 22 Jul 2005 Posts: 1047
|
Posted: Tue Aug 14, 2007 1:37 pm Post subject: |
|
|
| meli74 wrote: | | Hi..Good news..juz went to Juta Mines ofis juz nw, slsman told me CF is absolutely out either by end of Aug or early of Sept. But dis time they giving out the keys 1st to owner to check on their respective unit. Meaning that juta mines will call up owner come and collect key on dis week, Sat n Sun. So, pls contact Juta Mines right now to make the necessary arrangement. |
i am freaking fedap oredi that i did not call them since last week. the last time i called them was 2 August.
can get on Friday ah? - i am off on Friday :p |
|
| Back to top |
|
 |
meli74
Joined: 07 Aug 2007 Posts: 142 Location: Balakong
|
Posted: Tue Aug 14, 2007 1:43 pm Post subject: |
|
|
Either Satuday or Sunday
| g5sim wrote: | | meli74 wrote: | | Hi..Good news..juz went to Juta Mines ofis juz nw, slsman told me CF is absolutely out either by end of Aug or early of Sept. But dis time they giving out the keys 1st to owner to check on their respective unit. Meaning that juta mines will call up owner come and collect key on dis week, Sat n Sun. So, pls contact Juta Mines right now to make the necessary arrangement. |
i am freaking fedap oredi that i did not call them since last week. the last time i called them was 2 August.
can get on Friday ah? - i am off on Friday :p |
|
|
| Back to top |
|
 |
meli74
Joined: 07 Aug 2007 Posts: 142 Location: Balakong
|
Posted: Tue Aug 14, 2007 1:47 pm Post subject: |
|
|
u r welcome..may b dis time they oso felt that oredi late coz make so many promises, so, they give out the key 1st to make owner tutup mulut sekejap..ha..ha..
| erisha wrote: | | meli74 wrote: | | Hi..Good news..juz went to Juta Mines ofis juz nw, slsman told me CF is absolutely out either by end of Aug or early of Sept. But dis time they giving out the keys 1st to owner to check on their respective unit. Meaning that juta mines will call up owner come and collect key on dis week, Sat n Sun. So, pls contact Juta Mines right now to make the necessary arrangement. |
aiyak! i'm so exited sampai lupa i call in the midle of lunch hour. hehehe..
will call back at 2 pm.
thanks meli74. |
|
|
| Back to top |
|
 |
g5sim
Joined: 22 Jul 2005 Posts: 1047
|
Posted: Tue Aug 14, 2007 2:49 pm Post subject: |
|
|
| meli74 wrote: | | Hi..Good news..juz went to Juta Mines ofis juz nw, slsman told me CF is absolutely out either by end of Aug or early of Sept. But dis time they giving out the keys 1st to owner to check on their respective unit. Meaning that juta mines will call up owner come and collect key on dis week, Sat n Sun. So, pls contact Juta Mines right now to make the necessary arrangement. |
salah faham salah faham misunderstanding lah. Jutamines has sent out some of the letters. we should be getting them by Friday. Only those whose bank has disbursed all the loan amount to Jutamines or those who bought the unit by cash can get the keys lah. They are still working on the letters. still good news anyway  |
|
| Back to top |
|
 |
erisha
Joined: 21 Mar 2007 Posts: 250 Location: bangsar
|
Posted: Tue Aug 14, 2007 3:09 pm Post subject: |
|
|
| g5sim wrote: | salah faham salah faham misunderstanding lah. Jutamines has sent out some of the letters. we should be getting them by Friday. Only those whose bank has disbursed all the loan amount to Jutamines or those who bought the unit by cash can get the keys lah. They are still working on the letters. still good news anyway  |
itu kira gud news. yes it is. i rasa dlm sbln ni blh dpt kunci lah sbb nk kna
tggu perumahan release the last payment to jutamines. at least ada progres
la kan. hehe..
harap2nya kementerian perumahan tak pulak lmbt release payment. nnt lg
satu sakit kepala. hehe.. |
|
| Back to top |
|
 |
meli74
Joined: 07 Aug 2007 Posts: 142 Location: Balakong
|
Posted: Tue Aug 14, 2007 4:02 pm Post subject: |
|
|
| ooh like that..but bank procedure is "will only release final payment upon CF issued" woh..like that, everyone oso cant get key unless those using CASH to purchase. But why the slsman told me every owner can get the key????? |
|
| Back to top |
|
 |
erisha
Joined: 21 Mar 2007 Posts: 250 Location: bangsar
|
Posted: Tue Aug 14, 2007 4:39 pm Post subject: |
|
|
| meli74 wrote: | | ooh like that..but bank procedure is "will only release final payment upon CF issued" woh..like that, everyone oso cant get key unless those using CASH to purchase. But why the slsman told me every owner can get the key????? |
aiyak. like that ka? jutamines try to fool us around ka? or actually
they just send the letter and by the time bank request for cf, the
cf alredi given, then baru dia submit cf to the bank?
hopefully, hopefully. dh pening balik dh ni. |
|
| Back to top |
|
 |
e_jackal
Joined: 14 Aug 2007 Posts: 14
|
Posted: Wed Aug 15, 2007 2:36 pm Post subject: |
|
|
| Kerlsea wrote: | | thliow, congrates ! Earlier on when they said CF by Aug, I also plan to move in by Nov 2007.... Anyway, if you got good contractor for your decor, please share with us in the forum. Thanks.... |
We r a renovation contractor for residential as well as commercial buildings. Our service includes authority approval, Interior Design, general renovations, furniture, fittings, grill etc..
If u r looking for an alternative quotations for comparison, please do not hesitate to contact me via my email address asdeconstruction@hotmail.com , no obligation, if u r not happy with our price, u can always seek for others alternative contractors. Basically it all boils down to the materials you choose.
Cheers. |
|
| Back to top |
|
 |
erisha
Joined: 21 Mar 2007 Posts: 250 Location: bangsar
|
Posted: Wed Aug 15, 2007 3:12 pm Post subject: |
|
|
hi all..
i call william tadi. dia ckp bank tak perlu cf. hanya perlu rujuk pada
certificate yg dikeluarkan oleh architect firm. certificate tu pulak
hanya dikeluarkan setelah disahkan oleh MPKj. Cf should be selesai
dalam masa 1 bulan ini.
and yes, kita hanya boleh ambil kunci selepas bank (atau mana2 badan
yg pinjamkan duit) bayar habis semua baki yg ada. then, kita boleh ambil
kunci. selalunya akan selesai dalam sebulan selepas surat dikeluarkan
oleh developer.
harap2 kali ni betul dan benar2 berlaku. hehehe.. |
|
| Back to top |
|
 |
takumi86
Joined: 19 Jan 2006 Posts: 80
|
Posted: Thu Aug 16, 2007 8:11 am Post subject: |
|
|
congratulations everbody.....at last i have new neighbours at block B (banyak lama maaa), another good news, new mamak restaurant will be opened at the shop lot shortly, erisha, gsim, meli74, everybody......bolehla kita semua minum2 teh tarik. hehehe tak sabar  |
|
| Back to top |
|
 |
|