CPC, VP, CF, CMGD, CCC and such...

 
Post new topic   Reply to topic    Malaysia Real Estate Forum Index -> Certificate of Fitness for Occupation
View previous topic :: View next topic  
Author Message
sunrain



Joined: 01 Jul 2007
Posts: 65
Location: KL

PostPosted: Tue Sep 23, 2008 6:27 pm    Post subject: CPC, VP, CF, CMGD, CCC and such... Reply with quote

well... i've seen so many pepol asking questions about these...
so, hope this clear the air on some of the forumers questions regarding it...

CPC = Certificate of Practical Completion
is issued by the architect (Superintendant Officer (SO)) to the main contractor when the architect is satisfy with all the physical works being completed in the building.
for some development, CPC might includes getting all the supporting documents from all relevant authority for the application of CF (Certificate of Fitness) such as bomba, tnb, syabas, TM, local council (forgotten how many departments in total), JPS (road and drainage), IWK (sewerage) and a few more.

upon CPC, the main contractor will be able to claim for the release of 1st moeity - the 2.5% of the 5% retention sum

VP = Vacant Possesion

is issued by the SO to the project (developer) when all the conditions of CPC have been satisfied.
upon VP, all the infra and amenities have to be ready for connection but not necessarly the meter is physically there (eg TNB meter, syabas water meter)
Developer can hand over key to purchaser and thus start the countdown of defect liabilities period and LAD date is the VP date.
VP is issued upon submission of Borang E to the local authorities to obtain Certificate of Fitness (CF) with all the supporting documents from all the relevant authorities as mentioned above in CPC.
upon VP, developer will claim for the 12.5% from you/your bank.
NO, you cannot do any renovation to your units yet!

CF = Certificate of Fitness
Upon submission of Borang E, the local authority will have to reply within 14 days (i'm not sure it's all the same for all local authorities yet but MBPJ and MPKJ is practising this) whether to accept or reject the application of CF.
Among the conditions required is, all relevant parties recommendation letter (surat sokongan) again, refer to CPC, and also their own (local authorities) various dept inspection, namely Building Dept, Planning Dept, Road & drainage, landscaping, streetlighting, safety & health, etc etc.
all depts have to approve b4 u get ur CF!
in the event any of the depts do not issue surat sokongan to the said development, the local authority will reject the application within that 14 days and the developer have to go thru the whole process again from submitting a fresh copy of Borang E.
(this is usually the part where the developer always have problem of obtaining CF)

CMGD = certificate of making good practise
is issued by the SO after they're satisfied with the making good of defects once the defect liability period expired.
contractor get their 2.5% 2nd moeity upon issuance of CMGD
you or the bank also have to pay 2.5% to the developer.

CCC = Certificate of Completion and Compliance

u can read it here as i'm still very very new to it.
i have not handle any projects under the new CCC requirement up until now although it have been in place since 13 April 2007

But what i do know is if the DO for a certain development have been approved or issued prior to 13 April 2007, the whole development will still go thru the old process (VP, CF)

timeline as follows...

3 months b4 VP, tnb, syabas, tmb (telekom) submission, hence the deposite for the meters. but then again, most developers dun collect from buyers, will come out upfront themself and collect only during VP/key collection

CPC should be around the same time with VP... meaning that the SO is already satisfy with the site condition and all the supporting documents (surat sokongan) have been obtain in order for submission of Borang E for CF.

the earliest timeframe that u can get CF is 14 days after VP.
usually even if they have verbally approved and all the supporting documents are there, the developers should be able to get their CF cert within 1-3 months time depending on how good their connection is with the authority. This also depends on whether they provide sufficient brown envelope to all the relevant parties during inspection and obtaining surat sokongan.


CMGD = defect liability period... some projects 18 months, some more.

hope it helps... and correct me if i'm wrong

cheers
Back to top
View user's profile
jv17



Joined: 22 Oct 2008
Posts: 27

PostPosted: Tue Oct 28, 2008 9:30 am    Post subject: Reply with quote

yeah i saw this many times already anyway thanks for sharing..
_________________
Hello World
Back to top
View user's profile
Display posts from previous:   
Post new topic   Reply to topic    Malaysia Real Estate Forum Index -> Certificate of Fitness for Occupation All times are GMT + 8 Hours
Page 1 of 1

 
Jump to:  
You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot vote in polls in this forum



This is a free forum intended to foster communication between all users.
Hileytech Sdn Bhd does not guarantee the correctness or validity of postings, nor does Hileytech endorse any postings. No posting or contents in this forum can be copied and reproduced without prior permission from Hileytech and the owner of the posting. All other names and marks are trade names, trademarks or registered trademarks of their respective owners.
Powered by phpBB, Another web site by www.hileytech.com,Forum Archive
Tel : +60-3-42978281 ::  Fax : +60-3-42978254 :: hiley@hileytech.com